mirror of
https://github.com/garrytan/gstack.git
synced 2026-10-03 18:06:54 +02:00
fix(review): resolve the judged revalidation, setup-authority, plan-gate and findings-record ambiguities
The census review workflow judge scored clarity/actionability 3 on both attempts: smoke-clock limits appeared to forbid post-repair revalidation, the caller deadline was undefined, 'ask for setup' conflicted with the report-only browser rule, fallback-sourced HIGH discrepancies had no gate decision, and the Step 5.8 record omitted adversarial findings.
This commit is contained in:
1 parent
05ffcaf9e2
commit
175b12933d
15 files changed
+76
-43
No files matched your search
@@ -27,8 +27,8 @@ done
|
||||
3. **Validation:** For search results, read the first 20 lines and verify the project, feature and current branch. A mismatch means "no plan file found." Conversation-supplied paths bypass this search-result check.
|
||||
|
||||
**Error handling:**
|
||||
- No plan file found → skip with "No plan file detected — skipping."
|
||||
- Plan file found but unreadable (permissions, encoding) → skip with "Plan file found but unreadable — skipping."
|
||||
- No plan file found → say "No plan file detected." and use the Fallback Intent Sources below.
|
||||
- Plan file found but unreadable (permissions, encoding) → say "Plan file found but unreadable." and use the Fallback Intent Sources below; never report plan items as verified.
|
||||
|
||||
### Actionable Item Extraction
|
||||
|
||||
@@ -192,13 +192,15 @@ The plan completion results augment the existing Scope Drift Detection. If a pla
|
||||
|
||||
- **NOT DONE items** become additional evidence for **MISSING REQUIREMENTS** in the scope drift report.
|
||||
- **Items in the diff that don't match any plan item** become evidence for **SCOPE CREEP** detection.
|
||||
- **HIGH-impact discrepancies** trigger AskUserQuestion:
|
||||
- **HIGH-impact plan-file discrepancies** trigger AskUserQuestion:
|
||||
- Show the investigation findings
|
||||
- Options: A) Stop this review for implementation, B) Continue this review with P1 TODOs, C) Record the items as intentionally dropped
|
||||
- A ends this invocation before code review or implementation. List the missing work; after implementation, start a fresh /review.
|
||||
- B queues the approved TODO changes for Step 5, not this read-only audit. B/C continue to the final Scope Check and Step 2. None of these choices authorizes shipping or waives required verification.
|
||||
|
||||
This is **INFORMATIONAL** unless HIGH-impact discrepancies are found (then it gates via AskUserQuestion).
|
||||
This is **INFORMATIONAL** unless HIGH-impact plan-file discrepancies are found (then it gates via AskUserQuestion).
|
||||
Discrepancies derived only from fallback sources (commit messages, TODOS.md, PR description) never trigger
|
||||
this question, whatever their IMPACT: report them in the Scope Check as lower-confidence missing requirements.
|
||||
|
||||
When continuing after the audit (no HIGH-impact gate, or option B/C), emit the
|
||||
single final Scope Check using Step 1.5's provisional notes and this plan context:
|
||||
|
||||
Reference in new issue
Block a user