Merge remote-tracking branch 'origin/main' into garrytan/fix-wave-issues-prs

This commit is contained in:
Garry Tan
2026-08-16 12:42:57 -07:00
51 changed files with 3029 additions and 180 deletions
+27 -4
View File
@@ -999,10 +999,11 @@ Display:
- If \`skip_eng_review\` config is \`true\`, Eng Review shows "SKIPPED (global)" and verdict is CLEARED
**Staleness detection:** After displaying the dashboard, check if any existing reviews may be stale:
- Parse the \`---HEAD---\` section from the bash output to get the current HEAD commit hash
- For each review entry that has a \`commit\` field: compare it against the current HEAD. If different, count elapsed commits: \`git rev-list --count STORED_COMMIT..HEAD\`. Display: "Note: {skill} review from {date} may be stale — {N} commits since review"
- **Content-first rule (diff-scoped rows only: \`review\`, \`adversarial-review\`, \`codex-review\`, ship-stage entries).** Parse the \`---WTREE---\` and \`---DIRTY---\` sections from the bash output. If an entry has a \`wtree\` field AND it equals the current \`---WTREE---\` value, the review is CURRENT — identical content, regardless of commit count, rebase, amend, or whether it was committed yet (wtree equality alone proves identical content; that is the keystone property). Skip the commit-count heuristic for that entry and show no staleness note.
- Plan-tier rows (plan-ceo-review, plan-eng-review, plan-design-review) grade a plan file, not the repo tree — never apply the wtree rule to them; they keep the 7-day freshness logic. If such an entry carries a \`plan_sha256\` field, you MAY compare it against the current plan file's sha256 and note "plan changed since review" on mismatch.
- Fallback (no \`wtree\` on the entry, or wtree mismatch): parse the \`---HEAD---\` section to get the current HEAD commit hash. For each review entry that has a \`commit\` field: compare it against the current HEAD. If different, count elapsed commits: \`git rev-list --count STORED_COMMIT..HEAD\`. If that command FAILS (the stored commit was rebased away), grade UNKNOWN and treat as stale — do not error. Display: "Note: {skill} review from {date} may be stale — {N} commits since review"
- For entries without a \`commit\` field (legacy entries): display "Note: {skill} review from {date} has no commit tracking — consider re-running for accurate staleness detection"
- If all reviews match the current HEAD, do not display any staleness notes
- If all reviews grade CURRENT (wtree match or HEAD match), do not display any staleness notes
If the Eng Review is NOT "CLEAR":
@@ -1285,9 +1286,31 @@ EOF
**IRON LAW: NO COMPLETION CLAIMS WITHOUT FRESH VERIFICATION EVIDENCE.**
The evidence ledger is the mechanical arm of this law. Check it FIRST:
```bash
~/.claude/skills/gstack/bin/gstack-evidence check --label tests --expect-cmd '<exact tests-lane command from Step 5>' --label vitest --expect-cmd '<exact vitest-lane command from Step 5>' --max-age 24 --allow-paths CHANGELOG.md,VERSION,package.json
```
Pass each `--expect-cmd` the exact command string the wrapped Step 5 lane ran —
that binds FRESH to the real suite (a green `echo ok` recorded under the label
can never satisfy the check). Residual risk, accepted: `package.json` sits on
the allow-list because Step 12's version bump writes its version field between
the test run and this gate; a behavior-changing package.json edit in that
window would not invalidate evidence. The check is advisory either way.
- **Every line FRESH (exit 0):** the recorded runs were green and the working-tree
content is identical to what was tested, modulo the allow-listed release files
(this mechanizes the "CHANGELOG edits don't count" rule — VERSION/CHANGELOG
commits between Step 5 and here don't invalidate the run). Cite the evidence
lines (label, exit, ts, log path) as the verification evidence and continue.
- **Any STALE/MISSING (exit non-zero):** run live, wrapped, so the fresh run is
recorded: `~/.claude/skills/gstack/bin/gstack-evidence run --label <lane> -- '<command>'`.
The check is an advisory guardrail — a failed CHECK never blocks; a failed RUN does.
Before pushing, re-verify if code changed during Steps 4-6:
1. **Test verification:** If ANY code changed after Step 5's test run (fixes from review findings, CHANGELOG edits don't count), re-run the test suite. Paste fresh output. Stale output from Step 5 is NOT acceptable.
1. **Test verification:** If ANY code changed after Step 5's test run (fixes from review findings, CHANGELOG edits don't count), re-run the test suite. The evidence check above IS this rule, mechanized — trust FRESH, re-run on STALE. Paste fresh output when you re-run. Stale output from Step 5 with changed content is NOT acceptable.
2. **Build verification:** If the project has a build step, run it. Paste output.