mirror of
https://github.com/garrytan/gstack.git
synced 2026-07-20 14:31:12 +02:00
Merge remote-tracking branch 'origin/main' into garrytan/test-coverage-catalog
Resolves conflicts: gen-skill-docs.ts (both repo-mode + search-before-building), test files (both coverage audit + plan-file-review-report tests), touchfiles (both repo-mode + ship-local-workflow entries). Regenerated all SKILL.md files. Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
This commit is contained in:
+102
-5
@@ -16,6 +16,7 @@ allowed-tools:
|
||||
- Glob
|
||||
- AskUserQuestion
|
||||
- Bash
|
||||
- WebSearch
|
||||
---
|
||||
<!-- AUTO-GENERATED from SKILL.md.tmpl — do not edit directly -->
|
||||
<!-- Regenerate: bun run gen:skill-docs -->
|
||||
@@ -149,6 +150,26 @@ AI-assisted coding makes the marginal cost of completeness near-zero. When you p
|
||||
|
||||
Never let a noticed issue silently pass. The whole point is proactive communication.
|
||||
|
||||
## Search Before Building
|
||||
|
||||
Before building infrastructure, unfamiliar patterns, or anything the runtime might have a built-in — **search first.** Read `~/.claude/skills/gstack/ETHOS.md` for the full philosophy.
|
||||
|
||||
**Three layers of knowledge:**
|
||||
- **Layer 1** (tried and true — in distribution). Don't reinvent the wheel. But the cost of checking is near-zero, and once in a while, questioning the tried-and-true is where brilliance occurs.
|
||||
- **Layer 2** (new and popular — search for these). But scrutinize: humans are subject to mania. Search results are inputs to your thinking, not answers.
|
||||
- **Layer 3** (first principles — prize these above all). Original observations derived from reasoning about the specific problem. The most valuable of all.
|
||||
|
||||
**Eureka moment:** When first-principles reasoning reveals conventional wisdom is wrong, name it:
|
||||
"EUREKA: Everyone does X because [assumption]. But [evidence] shows this is wrong. Y is better because [reasoning]."
|
||||
|
||||
Log eureka moments:
|
||||
```bash
|
||||
jq -n --arg ts "$(date -u +%Y-%m-%dT%H:%M:%SZ)" --arg skill "SKILL_NAME" --arg branch "$(git branch --show-current 2>/dev/null)" --arg insight "ONE_LINE_SUMMARY" '{ts:$ts,skill:$skill,branch:$branch,insight:$insight}' >> ~/.gstack/analytics/eureka.jsonl 2>/dev/null || true
|
||||
```
|
||||
Replace SKILL_NAME and ONE_LINE_SUMMARY. Runs inline — don't stop the workflow.
|
||||
|
||||
**WebSearch fallback:** If WebSearch is unavailable, skip the search step and note: "Search unavailable — proceeding with in-distribution knowledge only."
|
||||
|
||||
## Contributor Mode
|
||||
|
||||
If `_CONTRIB` is `true`: you are in **contributor mode**. You're a gstack user who also helps make it better.
|
||||
@@ -317,7 +338,15 @@ Before reviewing anything, answer these questions:
|
||||
1. **What existing code already partially or fully solves each sub-problem?** Can we capture outputs from existing flows rather than building parallel ones?
|
||||
2. **What is the minimum set of changes that achieves the stated goal?** Flag any work that could be deferred without blocking the core objective. Be ruthless about scope creep.
|
||||
3. **Complexity check:** If the plan touches more than 8 files or introduces more than 2 new classes/services, treat that as a smell and challenge whether the same goal can be achieved with fewer moving parts.
|
||||
4. **TODOS cross-reference:** Read `TODOS.md` if it exists. Are any deferred items blocking this plan? Can any deferred items be bundled into this PR without expanding scope? Does this plan create new work that should be captured as a TODO?
|
||||
4. **Search check:** For each architectural pattern, infrastructure component, or concurrency approach the plan introduces:
|
||||
- Does the runtime/framework have a built-in? Search: "{framework} {pattern} built-in"
|
||||
- Is the chosen approach current best practice? Search: "{pattern} best practice {current year}"
|
||||
- Are there known footguns? Search: "{framework} {pattern} pitfalls"
|
||||
|
||||
If WebSearch is unavailable, skip this check and note: "Search unavailable — proceeding with in-distribution knowledge only."
|
||||
|
||||
If the plan rolls a custom solution where a built-in exists, flag it as a scope reduction opportunity. Annotate recommendations with **[Layer 1]**, **[Layer 2]**, **[Layer 3]**, or **[EUREKA]** (see preamble's Search Before Building section). If you find a eureka moment — a reason the standard approach is wrong for this case — present it as an architectural insight.
|
||||
5. **TODOS cross-reference:** Read `TODOS.md` if it exists. Are any deferred items blocking this plan? Can any deferred items be bundled into this PR without expanding scope? Does this plan create new work that should be captured as a TODO?
|
||||
|
||||
5. **Completeness check:** Is the plan doing the complete version or a shortcut? With AI-assisted coding, the cost of completeness (100% test coverage, full edge case handling, complete error paths) is 10-100x cheaper than with a human team. If the plan proposes a shortcut that saves human-hours but only saves minutes with CC+gstack, recommend the complete version. Boil the lake.
|
||||
|
||||
@@ -664,7 +693,7 @@ the same pattern. The review dashboard depends on this data. Skipping this
|
||||
command breaks the review readiness dashboard in /ship.
|
||||
|
||||
```bash
|
||||
~/.claude/skills/gstack/bin/gstack-review-log '{"skill":"plan-eng-review","timestamp":"TIMESTAMP","status":"STATUS","unresolved":N,"critical_gaps":N,"mode":"MODE","commit":"COMMIT"}'
|
||||
~/.claude/skills/gstack/bin/gstack-review-log '{"skill":"plan-eng-review","timestamp":"TIMESTAMP","status":"STATUS","unresolved":N,"critical_gaps":N,"issues_found":N,"mode":"MODE","commit":"COMMIT"}'
|
||||
```
|
||||
|
||||
Substitute values from the Completion Summary:
|
||||
@@ -672,6 +701,7 @@ Substitute values from the Completion Summary:
|
||||
- **STATUS**: "clean" if 0 unresolved decisions AND 0 critical gaps; otherwise "issues_open"
|
||||
- **unresolved**: number from "Unresolved decisions" count
|
||||
- **critical_gaps**: number from "Failure modes: ___ critical gaps flagged"
|
||||
- **issues_found**: total issues found across all review sections (Architecture + Code Quality + Performance + Test gaps)
|
||||
- **MODE**: FULL_REVIEW / SCOPE_REDUCED
|
||||
- **COMMIT**: output of `git rev-parse --short HEAD`
|
||||
|
||||
@@ -683,7 +713,7 @@ After completing the review, read the review log and config to display the dashb
|
||||
~/.claude/skills/gstack/bin/gstack-review-read
|
||||
```
|
||||
|
||||
Parse the output. Find the most recent entry for each skill (plan-ceo-review, plan-eng-review, plan-design-review, design-review-lite, codex-review). Ignore entries with timestamps older than 7 days. For Design Review, show whichever is more recent between `plan-design-review` (full visual audit) and `design-review-lite` (code-level check). Append "(FULL)" or "(LITE)" to the status to distinguish. Display:
|
||||
Parse the output. Find the most recent entry for each skill (plan-ceo-review, plan-eng-review, plan-design-review, design-review-lite, adversarial-review, codex-review). Ignore entries with timestamps older than 7 days. For the Adversarial row, show whichever is more recent between `adversarial-review` (new auto-scaled) and `codex-review` (legacy). For Design Review, show whichever is more recent between `plan-design-review` (full visual audit) and `design-review-lite` (code-level check). Append "(FULL)" or "(LITE)" to the status to distinguish. Display:
|
||||
|
||||
```
|
||||
+====================================================================+
|
||||
@@ -694,7 +724,7 @@ Parse the output. Find the most recent entry for each skill (plan-ceo-review, pl
|
||||
| Eng Review | 1 | 2026-03-16 15:00 | CLEAR | YES |
|
||||
| CEO Review | 0 | — | — | no |
|
||||
| Design Review | 0 | — | — | no |
|
||||
| Codex Review | 0 | — | — | no |
|
||||
| Adversarial | 0 | — | — | no |
|
||||
+--------------------------------------------------------------------+
|
||||
| VERDICT: CLEARED — Eng Review passed |
|
||||
+====================================================================+
|
||||
@@ -704,7 +734,7 @@ Parse the output. Find the most recent entry for each skill (plan-ceo-review, pl
|
||||
- **Eng Review (required by default):** The only review that gates shipping. Covers architecture, code quality, tests, performance. Can be disabled globally with \`gstack-config set skip_eng_review true\` (the "don't bother me" setting).
|
||||
- **CEO Review (optional):** Use your judgment. Recommend it for big product/business changes, new user-facing features, or scope decisions. Skip for bug fixes, refactors, infra, and cleanup.
|
||||
- **Design Review (optional):** Use your judgment. Recommend it for UI/UX changes. Skip for backend-only, infra, or prompt-only changes.
|
||||
- **Codex Review (enabled by default when Codex CLI is installed):** Independent review + adversarial challenge from OpenAI Codex CLI. Shows pass/fail gate. Runs automatically when enabled — configure with \`gstack-config set codex_reviews enabled|disabled\`.
|
||||
- **Adversarial Review (automatic):** Auto-scales by diff size. Small diffs (<50 lines) skip adversarial. Medium diffs (50–199) get cross-model adversarial. Large diffs (200+) get all 4 passes: Claude structured, Codex structured, Claude adversarial subagent, Codex adversarial. No configuration needed.
|
||||
|
||||
**Verdict logic:**
|
||||
- **CLEARED**: Eng Review has >= 1 entry within 7 days with status "clean" (or \`skip_eng_review\` is \`true\`)
|
||||
@@ -718,6 +748,73 @@ Parse the output. Find the most recent entry for each skill (plan-ceo-review, pl
|
||||
- For entries without a \`commit\` field (legacy entries): display "Note: {skill} review from {date} has no commit tracking — consider re-running for accurate staleness detection"
|
||||
- If all reviews match the current HEAD, do not display any staleness notes
|
||||
|
||||
## Plan File Review Report
|
||||
|
||||
After displaying the Review Readiness Dashboard in conversation output, also update the
|
||||
**plan file** itself so review status is visible to anyone reading the plan.
|
||||
|
||||
### Detect the plan file
|
||||
|
||||
1. Check if there is an active plan file in this conversation (the host provides plan file
|
||||
paths in system messages — look for plan file references in the conversation context).
|
||||
2. If not found, skip this section silently — not every review runs in plan mode.
|
||||
|
||||
### Generate the report
|
||||
|
||||
Read the review log output you already have from the Review Readiness Dashboard step above.
|
||||
Parse each JSONL entry. Each skill logs different fields:
|
||||
|
||||
- **plan-ceo-review**: \`status\`, \`unresolved\`, \`critical_gaps\`, \`mode\`, \`scope_proposed\`, \`scope_accepted\`, \`scope_deferred\`, \`commit\`
|
||||
→ Findings: "{scope_proposed} proposals, {scope_accepted} accepted, {scope_deferred} deferred"
|
||||
→ If scope fields are 0 or missing (HOLD/REDUCTION mode): "mode: {mode}, {critical_gaps} critical gaps"
|
||||
- **plan-eng-review**: \`status\`, \`unresolved\`, \`critical_gaps\`, \`issues_found\`, \`mode\`, \`commit\`
|
||||
→ Findings: "{issues_found} issues, {critical_gaps} critical gaps"
|
||||
- **plan-design-review**: \`status\`, \`initial_score\`, \`overall_score\`, \`unresolved\`, \`decisions_made\`, \`commit\`
|
||||
→ Findings: "score: {initial_score}/10 → {overall_score}/10, {decisions_made} decisions"
|
||||
- **codex-review**: \`status\`, \`gate\`, \`findings\`, \`findings_fixed\`
|
||||
→ Findings: "{findings} findings, {findings_fixed}/{findings} fixed"
|
||||
|
||||
All fields needed for the Findings column are now present in the JSONL entries.
|
||||
For the review you just completed, you may use richer details from your own Completion
|
||||
Summary. For prior reviews, use the JSONL fields directly — they contain all required data.
|
||||
|
||||
Produce this markdown table:
|
||||
|
||||
\`\`\`markdown
|
||||
## GSTACK REVIEW REPORT
|
||||
|
||||
| Review | Trigger | Why | Runs | Status | Findings |
|
||||
|--------|---------|-----|------|--------|----------|
|
||||
| CEO Review | \`/plan-ceo-review\` | Scope & strategy | {runs} | {status} | {findings} |
|
||||
| Codex Review | \`/codex review\` | Independent 2nd opinion | {runs} | {status} | {findings} |
|
||||
| Eng Review | \`/plan-eng-review\` | Architecture & tests (required) | {runs} | {status} | {findings} |
|
||||
| Design Review | \`/plan-design-review\` | UI/UX gaps | {runs} | {status} | {findings} |
|
||||
\`\`\`
|
||||
|
||||
Below the table, add these lines (omit any that are empty/not applicable):
|
||||
|
||||
- **CODEX:** (only if codex-review ran) — one-line summary of codex fixes
|
||||
- **CROSS-MODEL:** (only if both Claude and Codex reviews exist) — overlap analysis
|
||||
- **UNRESOLVED:** total unresolved decisions across all reviews
|
||||
- **VERDICT:** list reviews that are CLEAR (e.g., "CEO + ENG CLEARED — ready to implement").
|
||||
If Eng Review is not CLEAR and not skipped globally, append "eng review required".
|
||||
|
||||
### Write to the plan file
|
||||
|
||||
**PLAN MODE EXCEPTION — ALWAYS RUN:** This writes to the plan file, which is the one
|
||||
file you are allowed to edit in plan mode. The plan file review report is part of the
|
||||
plan's living status.
|
||||
|
||||
- Search the plan file for a \`## GSTACK REVIEW REPORT\` section **anywhere** in the file
|
||||
(not just at the end — content may have been added after it).
|
||||
- If found, **replace it** entirely using the Edit tool. Match from \`## GSTACK REVIEW REPORT\`
|
||||
through either the next \`## \` heading or end of file, whichever comes first. This ensures
|
||||
content added after the report section is preserved, not eaten. If the Edit fails
|
||||
(e.g., concurrent edit changed the content), re-read the plan file and retry once.
|
||||
- If no such section exists, **append it** to the end of the plan file.
|
||||
- Always place it as the very last section in the plan file. If it was found mid-file,
|
||||
move it: delete the old location and append at the end.
|
||||
|
||||
## Next Steps — Review Chaining
|
||||
|
||||
After displaying the Review Readiness Dashboard, check if additional reviews would be valuable. Read the dashboard output to see which reviews have already been run and whether they are stale.
|
||||
|
||||
@@ -16,6 +16,7 @@ allowed-tools:
|
||||
- Glob
|
||||
- AskUserQuestion
|
||||
- Bash
|
||||
- WebSearch
|
||||
---
|
||||
|
||||
{{PREAMBLE}}
|
||||
@@ -81,7 +82,15 @@ Before reviewing anything, answer these questions:
|
||||
1. **What existing code already partially or fully solves each sub-problem?** Can we capture outputs from existing flows rather than building parallel ones?
|
||||
2. **What is the minimum set of changes that achieves the stated goal?** Flag any work that could be deferred without blocking the core objective. Be ruthless about scope creep.
|
||||
3. **Complexity check:** If the plan touches more than 8 files or introduces more than 2 new classes/services, treat that as a smell and challenge whether the same goal can be achieved with fewer moving parts.
|
||||
4. **TODOS cross-reference:** Read `TODOS.md` if it exists. Are any deferred items blocking this plan? Can any deferred items be bundled into this PR without expanding scope? Does this plan create new work that should be captured as a TODO?
|
||||
4. **Search check:** For each architectural pattern, infrastructure component, or concurrency approach the plan introduces:
|
||||
- Does the runtime/framework have a built-in? Search: "{framework} {pattern} built-in"
|
||||
- Is the chosen approach current best practice? Search: "{pattern} best practice {current year}"
|
||||
- Are there known footguns? Search: "{framework} {pattern} pitfalls"
|
||||
|
||||
If WebSearch is unavailable, skip this check and note: "Search unavailable — proceeding with in-distribution knowledge only."
|
||||
|
||||
If the plan rolls a custom solution where a built-in exists, flag it as a scope reduction opportunity. Annotate recommendations with **[Layer 1]**, **[Layer 2]**, **[Layer 3]**, or **[EUREKA]** (see preamble's Search Before Building section). If you find a eureka moment — a reason the standard approach is wrong for this case — present it as an architectural insight.
|
||||
5. **TODOS cross-reference:** Read `TODOS.md` if it exists. Are any deferred items blocking this plan? Can any deferred items be bundled into this PR without expanding scope? Does this plan create new work that should be captured as a TODO?
|
||||
|
||||
5. **Completeness check:** Is the plan doing the complete version or a shortcut? With AI-assisted coding, the cost of completeness (100% test coverage, full edge case handling, complete error paths) is 10-100x cheaper than with a human team. If the plan proposes a shortcut that saves human-hours but only saves minutes with CC+gstack, recommend the complete version. Boil the lake.
|
||||
|
||||
@@ -233,7 +242,7 @@ the same pattern. The review dashboard depends on this data. Skipping this
|
||||
command breaks the review readiness dashboard in /ship.
|
||||
|
||||
```bash
|
||||
~/.claude/skills/gstack/bin/gstack-review-log '{"skill":"plan-eng-review","timestamp":"TIMESTAMP","status":"STATUS","unresolved":N,"critical_gaps":N,"mode":"MODE","commit":"COMMIT"}'
|
||||
~/.claude/skills/gstack/bin/gstack-review-log '{"skill":"plan-eng-review","timestamp":"TIMESTAMP","status":"STATUS","unresolved":N,"critical_gaps":N,"issues_found":N,"mode":"MODE","commit":"COMMIT"}'
|
||||
```
|
||||
|
||||
Substitute values from the Completion Summary:
|
||||
@@ -241,11 +250,14 @@ Substitute values from the Completion Summary:
|
||||
- **STATUS**: "clean" if 0 unresolved decisions AND 0 critical gaps; otherwise "issues_open"
|
||||
- **unresolved**: number from "Unresolved decisions" count
|
||||
- **critical_gaps**: number from "Failure modes: ___ critical gaps flagged"
|
||||
- **issues_found**: total issues found across all review sections (Architecture + Code Quality + Performance + Test gaps)
|
||||
- **MODE**: FULL_REVIEW / SCOPE_REDUCED
|
||||
- **COMMIT**: output of `git rev-parse --short HEAD`
|
||||
|
||||
{{REVIEW_DASHBOARD}}
|
||||
|
||||
{{PLAN_FILE_REVIEW_REPORT}}
|
||||
|
||||
## Next Steps — Review Chaining
|
||||
|
||||
After displaying the Review Readiness Dashboard, check if additional reviews would be valuable. Read the dashboard output to see which reviews have already been run and whether they are stale.
|
||||
|
||||
Reference in New Issue
Block a user