Commit Graph
2 Commits
Author SHA1 Message Date
Garry TanandClaude Fable 5 45b72989e6 fix(hooks): timeline Stop hook reads a 256KB tail instead of the whole file
The Stop hook runs on EVERY Claude Code turn machine-wide and re-read +
JSON-parsed the entire timeline each time, scaling to the 10MB size cap
(~100-300ms per turn of pure overhead). It now reads only the last 256KB
via fstat + positioned read, discarding the first partial line when the
window starts mid-file.

Semantics: a dangling "started" older than the last 256KB of appends
belongs to a session long gone — beyond repair interest. The window can
never fabricate a dangling entry ("completed" is always appended AFTER its
"started", so any started inside the window has its completion inside the
window too), so idempotency holds. The fail-open contract is unchanged:
exit 0 always, size cap kept, deadline re-checked before the write.

New test: a >256KB timeline where a recent dangling entry still gets
repaired while an old out-of-window dangler is left alone; all existing
fail-open cases pass unchanged.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-16 14:13:15 -07:00
Garry TanandClaude Fable 5 4d0e7b7c2a feat(hooks): Stop hook closes dangling timeline entries — fail-open
The preamble writes event:'started' to the project timeline at every skill
start, but the matching 'completed' write lives in prose at the END of the
skill workflow — unenforceable. An interrupted session, a context blowout,
or an agent that simply stops leaked started > completed forever, and the
leak was unrepairable after the fact (observed live in #2553).

New hosts/claude/hooks/timeline-stop-hook (+ .ts, question-log-hook shim
pattern): on Claude Code's Stop event it appends event:'completed' with
outcome 'unknown' and source 'stop-hook' for every 'started' entry in the
project timeline that has no matching completion. setup registers it via
gstack-settings-hook add-event (Stop was already an accepted event) under
its own source tag, idempotently; --no-team and gstack-uninstall remove it.

FAIL-OPEN contract (F5), pinned by tests: ALWAYS exits 0 — corrupt
timeline (bad lines skipped individually, valid ones still repaired),
missing timeline, garbage/empty stdin, bun missing from PATH (the shim
'|| true's), and an over-cap timeline (10MB skip) all repair nothing and
block nothing; errors land in ~/.gstack/hook-errors.log best-effort. The
write path is append-only with a ~2s internal budget, and a second Stop is
a no-op (already-closed entries never re-close). Correlation is
project-scoped by design — the preamble's session id is shell-local, so a
concurrent same-project session's entry may close early as a traceable
source:'stop-hook' row rather than a silent leak; the header documents the
trade-off.

Fixes #2553

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-16 09:49:32 -07:00