Files
gstack/docs/test-audit-2026-09.md
T
garrytan 67084a5caf test: run seven paid evals on the current default capture model (B8)
skill-e2e-{auq-matrix,plan-format,qa-bugs,retro,workflow} pinned
claude-opus-4-7 and skill-e2e-office-hours plus -brain-writeback pinned
claude-sonnet-4-6; none tests a historical model, so they now capture with
resolveEvalModel('capture'), and the free harness tests that execute these
registrations receive the same resolver. The paid re-pin run passed all of
them. skill-e2e-{design,office-hours-phase4,plan-prosons,plan} keep
claude-opus-4-7: six of their cases failed on the default model (three
timeouts, a missing report file, a format miss and a posture score of 3), so
per the plan's fallback they keep their pins with a TODOS entry. The pre-spend
estimate and drop threshold are in docs/test-audit-2026-09.md.
2026-09-29 09:16:19 +00:00

1.6 KiB
Raw Blame History

Test audit 2026-09: evidence

Evidence for the test-reduction branch (plan approved via /autoplan). Sections are added by the commit they support.

B8 pre-spend estimate (recorded 2026-09-29, before any B8 paid run)

Source: latest weekly periodic artifacts (runs 36385945043 = 09-28, 35567915613 = 09-21), per-shard eval JSON cost_usd. Price ratio from test/helpers/pricing.ts: claude-fable-5-1 (default capture, lib/eval-model.ts) $10/$50 per MTok in/out; claude-opus-4-7 $15/$75 (ratio 0.667 on both); claude-sonnet-4-6 $3/$15 (ratio 3.33 on both).

Files Old pin Weekly $ (09-28) Est. weekly $ on default Delta
plan, design, plan-prosons, plan-format, qa-bugs, retro, office-hours-phase4 opus-4-7 15.78 10.52 −5.26
office-hours, office-hours-brain-writeback sonnet-4-6 0.91 3.03 +2.12
auq-matrix, workflow opus-4-7 no result in the retained artifacts — ≤ 0 (ratio 0.667)
B8 total 16.69 13.55 −3.14

Assumes the same token volume per case (a verbosity change moves this; the ratio applies to input and output alike). Wall clock: unchanged shard walls (budgets do not depend on model). Drop threshold, fixed now: B8 is dropped from this PR if its estimated net weekly dollars after C and B5 savings are above zero. Estimated net: −3.14 (B8) − C savings (five retired evals) − B5 savings (18 hollow shards, 23 census judges) < 0 → B8 proceeds to its one paid run. Fallback check: git log -S claude-sonnet-4-6 on skill-e2e-office-hours and -brain-writeback shows only 636175d / #2264 (infra hardening), no cost rationale → both re-pinned.