Files
gstack/test
garrytan 8e9641c65f plan-design-review: scope gate runs Step 0 before mockups (W5.4, s05 H6)
The scope gate said 'audit → mockups → Step 0' while the body runs Step 0
(0A-0D) first and 0D announces 'I'll generate visual mockups next'. Per the
W5.4 decision, the three gate phrases now read audit → Step 0 → Step 0.5
mockups. 'Reply with A, B, or C' is unchanged.

W7a pins:
- test/plan-scope-selection.test.ts:616 pinned the old order sentence; it now
  checks the order of the 'After resolution:' steps (preamble, base branch,
  audit, Step 0, mockups). Negative control: the old order turns it red.
- test/gen-skill-docs.test.ts:4737 normalizer strips the design-only
  'Then run the pre-review audit, ... against that plan.' sentence by pattern.
expected red until the regeneration commit
2026-10-03 00:14:50 +00:00
..