mirror of
https://github.com/garrytan/gstack.git
synced 2026-11-05 16:34:00 +01:00
pregate kills the remote gate at --timeout with a 5 s grace, which could cut a VM teardown short. pregate-remote.sh now reads the enclosing deadline (PREGATE_TIMEOUT_S, else the gstack-pregate --timeout it runs under, else 600), reserves 120 s for teardown plus 15 s margin, and tells the VM to stop at the earlier of that point and the cap's wall; a deadline that leaves under 300 s refuses before any VM (PREGATE_REMOTE_TIMEOUT_TOO_SHORT). It names the VM up front and prints the exact ubi-runner.sh down line, and the body is one braced block so an edit to the script mid-run cannot change what the run executes (keyed run 5 died after teardown with '$2: unbound variable' for that reason). Co-authored-by: capy-ai[bot] <230910855+capy-ai[bot]@users.noreply.github.com>