Garry TanandClaude Opus 4.8 b9919f25b4 test(tiers): reclassify stochastic plan-eng/plan-design ask-first smokes as periodic
plan-eng-review and plan-design-review run a long explore/audit before their
first AskUserQuestion, so whether the plan-mode + finding-floor smokes reach a
terminal outcome within the 300s/600s budget depends on stochastic ask-first
compliance (measured ~50-67%/run even with the hardened gate). Per the
"non-deterministic -> periodic" tiering rule, move the four affected smokes
(plan-eng/plan-design review-plan-mode + finding-floor) to periodic.

The deterministic harness fix (collapsed-form detector + judge precedence) and
the ask-first gate lift these from always-failing to mostly-passing and are the
real product+harness improvements; periodic monitoring tracks the rate weekly
without blocking PRs on an LLM coin-flip. plan-ceo/plan-devex ask-first reliably
and stay gate-tier.