`GSTACK_REVIEW_PLAN_TIMEOUT_MS` now raises the review-plan time limit in
every place /ship runs the plan, not just two of them.
Why: on a 301,669-file repository the plan takes 255 to 316 s on a
2-core machine; the plan and the review pass read the variable, but
render and preflight still cut it off at 180 s.
Nothing to do unless your repository is large; then set the variable
(docs/troubleshooting.md#review-plan-stopped).
Co-authored-by: capy-ai[bot] <230910855+capy-ai[bot]@users.noreply.github.com>