* wip: stable 72-hour floor, security exception, twice-weekly cadence Co-authored-by: capy-ai[bot] <230910855+capy-ai[bot]@users.noreply.github.com> * wip: changelog, coverage cases for tag-before-stable and multi-tag Co-authored-by: capy-ai[bot] <230910855+capy-ai[bot]@users.noreply.github.com> * fix: floor fails closed on undatable moves, recorded security evidence on finish, npm-only advisory match Co-authored-by: capy-ai[bot] <230910855+capy-ai[bot]@users.noreply.github.com> * docs: prose fixes for the floor and security sections Co-authored-by: capy-ai[bot] <230910855+capy-ai[bot]@users.noreply.github.com> * docs: FLOOR_UNKNOWN wording names the security exception; sanitizer and outcome rows match the code Co-authored-by: capy-ai[bot] <230910855+capy-ai[bot]@users.noreply.github.com> * fix: the floor dates stable from its v<VERSION> tag, so a stray extra tag cannot stall cuts silently Co-authored-by: capy-ai[bot] <230910855+capy-ai[bot]@users.noreply.github.com> --------- Co-authored-by: capy-ai[bot] <230910855+capy-ai[bot]@users.noreply.github.com>
15 KiB
Releases and update channels
gstack stamps a version at every merge to main, about a dozen a day. Since late October 2026 there is also a tagged release, cut twice a week, and team-mode installs follow it instead of every merge.
What a release is
Every Monday and Thursday at 14:00 UTC (07:00 Pacific, 06:00 in winter) the
Stable release workflow (.github/workflows/weekly-release.yml, which
runs scripts/release-cut.ts; the file kept its old name so its run history
and the gh workflow run commands below stay valid) takes the newest green
commit on main and:
- tags it
v<VERSION>(the VERSION file at that commit, an annotated tag); - publishes a GitHub Release whose notes are one line per CHANGELOG version since the previous release, with a compare link and a link to the full CHANGELOG at that tag;
- fast-forwards the
stablebranch to it.
A tag and its release never change. stable is a moving pointer: always a
commit on main's first-parent history, moved only by this workflow, only
forward, and at most once every 72 hours except for a security fix (below).
Green means, on that exact commit: the free-tests check run succeeded
(the status main requires), the commit was gated (below), every check run on
it has completed and none failed, and refs/notes/gstack-trains holds no
active freeze. A cancelled check run counts as red. A commit with a check run
still going is skipped and the next older one is considered, back through 7
days or 200 first-parent commits. The workflow runs no tests and no paid evals
of its own; it only reads what the trains and the backstop already recorded.
With nothing green in the window it fails and lists why each commit was
skipped.
Gated means one of two pieces of evidence. The first is the
main-backstop check run: the Main backstop gate workflow publishes it on
each push to main from a job of its own, success when a green train record
covers the tree or the backstop gated it green, neutral when main moved past
the push before it was gated (superseded) or a freeze's own backstop run owns
it (deferred), failure when it froze the queue or could not finish. The second
is a train record in refs/notes/gstack-trains (kind train, state
green, merging or merged) whose merged[] lists the commit's sha or
its tree: those entries are the main commits gstack-ship-queue verify --train confirmed, so a commit a green train merged is gated even when trains
merged faster than the backstop could settle and its own backstop run ended
neutral or never ran. The CANDIDATE line says which: gated by main-backstop or gated by train <nonce>. Train evidence relaxes nothing
else: a red backstop run, a failed or missing free-tests run, any other red
check run or a run still going keeps the commit out, and a record in any other
state (red, superseded, free-green, …) is not evidence. A commit with
neither a successful backstop run nor a train record is not released: a
dependabot push, a policy without a train block, or a tree that was never
gated.
Another repository runs the same script with its own names:
--required-check <name> (default free-tests), --backstop-check <name>
(default main-backstop) and --notes-ref <ref> (default
refs/notes/gstack-trains). weekly-release.yml passes none of them.
A cut that stopped half-way (tag and stable pushed, release not created) is
finished by the next run, by cron or by hand: stable itself stays a
candidate until its release exists, and its notes compare against the release
tag before it.
The 72-hour floor
stable moves at most once every 72 hours (Garry, 2026-10-27). Every cut,
scheduled or by hand, with or without ref, checks when stable last moved:
the creation time of the annotated v<VERSION> tag (VERSION read at stable)
pointing at stable, or the publish time of that tag's GitHub Release when it
is later (a cut whose stable push was retried after the tag was pushed is
dated by its release). Any other tag on that commit is ignored, so a hand-made
extra tag can neither date the move nor stall later cuts.
A cut inside the floor changes nothing and prints, as its first two lines:
REFUSED_FLOOR: stable moved to v1.91.300.0 at 2026-11-02T14:04:51Z, 47.2 h ago; a hand-run cut needs 72 h; a security fix passes with --security "<GHSA-…|CVE-…|#n>: why" --ref <fix sha>
NEXT_ALLOWED: 2026-11-05T14:04:51Z for a hand-run cut; 2026-11-05T11:04:51Z for a scheduled run
followed by the plan it would have run. Monday to Thursday is exactly 72
hours, so scheduled runs, and only scheduled runs (GITHUB_EVENT_NAME=schedule,
which no dispatch input can set), get a 3-hour grace for GitHub's late cron
starts: a Thursday run 69 hours after a late Monday cut still cuts. Two
regular moves are therefore never less than 69 hours apart, and a hand-run cut
always needs the full 72. Thursday to Monday is 96 hours.
A refused hand cut exits 1 with an error annotation. A refused scheduled run
exits 0 with a notice annotation and the same lines in the step summary: that
is the policy working (a security cut on Wednesday holds Thursday, and
Monday's cut carries everything), not a fault. A dry run prints the plan and
the floor verdict (FLOOR: line) and exits 0.
Two cases are not held. The first cut, before stable exists, has nothing to
measure. Finishing a half-done cut (stable already at the candidate, release
missing) is not a new move, and a run without ref finishes that cut before
it considers anything newer.
The floor fails closed when it cannot date the move. Three cases are
FLOOR_UNKNOWN, red on every trigger, and only a verified security cut gets
past them, as it gets past the floor. They are a stable that no annotated v<VERSION> tag dates
(only this tool moves stable and it tags first, so that state means someone
moved it by hand), a release that cannot be read (a GitHub API error is not
"no release"), and a ref cut while stable's own release is still
unpublished (its tag may be days older than the push). A tag dated in the
future holds the floor from now, not from that date. The floor binds the
release tool, not a writer pushing stable directly; that would take a branch
ruleset limiting stable to the Actions bot.
The floor applies to non-security breakage too. If a cut breaks team
installs, the fix waits for the floor; an affected install can follow main
meanwhile (gstack-config set update_channel main) and the next scheduled
cut brings it back.
Security releases
A security fix is the one exception to the floor. Run the workflow by hand
with ref set to the fix commit on main and security set to a reason that
names what it fixes:
gh workflow run weekly-release.yml -f ref=<full sha of the fix> -f security="GHSA-xxxx-xxxx-xxxx: tar path traversal" -f dry_run=false
The reason must name a GHSA-…, a CVE-… or an issue or pull request
#<n>, and the tool checks that it is tied to the commits being released
(stable..ref). One of these must hold:
- a commit message in that span names the same GHSA or CVE;
- issue or pull request
#<n>carries thesecuritylabel and a commit in the span references#<n>(the squash subject(#<n>)does); - the GitHub Advisory Database entry for the GHSA or CVE (the data OSV
imports) lists an npm package whose own entry changes in the span's
package.jsonorbun.lock(a dependency line or a lockfile package key, never a name listed inside another package's entry): a dependency bump that fixes a known advisory. The direction of the bump and the patched range are not checked.
Verified: the identifier exists in the reason, the label exists on the
issue, and the link between the identifier and a released commit or bumped
package. Attested, not verified: that the change actually fixes the
vulnerability, how severe it is, and that it cannot wait; the security
label itself is applied by a person with triage access. A reason the tool
cannot tie to the span is REFUSED_SECURITY with what it checked, red on
every trigger, as is security without ref: a security cut releases up to
the fix, never whatever happens to be newest. Every version between stable
and the fix still ships with it (there are no cherry-picks); the plan's
RIDING_ALONG: line counts them.
The reason is public. It goes, as one line of at most 300 characters (control
characters become spaces and backticks become apostrophes), into the tag
message and the release notes: **Security release:** `<reason>` (verified: <evidence>). For an
embargoed fix, use path 2 with a neutral commit subject and a labelled issue
whose title says no more than the fix does, and keep advisory details out of
the reason until disclosure.
A security cut that stopped half-way after moving stable is finished by
the next run with the reason and evidence its tag recorded, without checking
them again. A tag that records a security cut but never moved stable gets
no such pass: the cut is refused (REFUSED_SECURITY) until it runs again
with security and ref and verifies. The floor then counts from the security
release, and the next regular cut's notes list only the versions after it.
Channels
| Channel | Follows | Who |
|---|---|---|
stable |
refs/heads/stable: the twice-weekly release (at most once per 72 hours), plus any security cut off-cycle |
team mode (./setup --team) by default |
main |
every merge to main | plain ./setup, contributors, Capy crew machines |
The config key is update_channel (bin/gstack-config):
gstack-config get update_channel # auto (default) | stable | main
gstack-config set update_channel main # a team install that wants every merge
gstack-config set update_channel stable # a solo install that wants stable releases
gstack-config unset update_channel # back to auto
auto resolves to stable when team_mode is true and to main otherwise,
so existing team installs moved to stable releases with nothing to migrate and
contributor installs did not move at all. GSTACK_UPDATE_CHANNEL=stable|main
overrides the key for one command. The resolution lives in one helper,
bin/gstack-update-channel.sh, used by:
bin/gstack-session-update, the team-mode session-start hook: it fetches the channel ref and fast-forwards to it. Its log (<state root>/analytics/session-update.log) carriesCHANNEL stable target=<sha>when it follows a release.bin/gstack-update-check, the "update available" line in every skill preamble: it reads<channel>/VERSIONand compares withrefs/heads/<channel>, so a stable install is not told every hour that main moved.bin/gstack-upgradeand/gstack-upgrade: they fast-forward to the channel ref (UPSTREAM_REF=origin/stablein the skill's output) and say which channel they followed.
Two edge cases are handled on purpose:
- Before the first release exists origin has no
stable. Every caller then follows main and says so (CHANNEL_FALLBACK stable->mainin the hook log,channel stable has no release on origin yetfromgstack-upgrade). - An install already past the release (it followed main until now, or a hotfix was cut below it) stays where it is until stable passes it. The updater never moves a checkout backwards. A depth-1 clone cannot see that an older release is its ancestor, so the VERSIONs decide: main stamps a higher version at every merge and stable is always a main commit.
The local branch stays main either way. A stable install is a main
checkout parked at the last released commit, which is why fast-forward-only
still holds and nothing about version stamping changed.
Cutting a release by hand (hotfixes)
A hotfix is an ordinary PR: it merges to main through a train and gets its version like any other change. To put it on stable before the next scheduled cut, run the workflow by hand with the merge commit's SHA, once the 72-hour floor allows it (a security fix uses the security input instead):
gh workflow run weekly-release.yml -f ref=<full sha on main> -f dry_run=false
or open Actions, pick Stable release and press Run workflow, on main (the cut job runs
only from refs/heads/main, with main's tooling; ref must be the full
40-hex SHA). The same green checks apply. The commit is tagged with its VERSION, the release notes say "hotfix release"
and list every version since the previous release (everything merged in
between ships with it), and stable fast-forwards. Team installs pick it up at
their next hourly check.
There is no release branch and no cherry-picking: stable only ever names main commits. If main carries a change that must not ship yet, revert it on main first, then promote.
Dry runs
Run the workflow with dry_run=true (the default for a manual run) to see the
plan without changing anything: the candidate, its VERSION and tag, the stable
move, how many version lines the notes would carry, every skipped commit with
its reason, the floor verdict, and the exact commands a real cut would run. The scheduled
runs are never dry runs.
gh workflow run weekly-release.yml -f dry_run=true
gh run watch
The step summary carries the same plan plus the full release notes.
A pull request that touches .github/workflows/weekly-release.yml or
scripts/release-cut.ts runs the same dry run against main as its own job
(Dry run against main, read-only token), so a change to the release tooling
is exercised against real check runs before it merges.
Outcomes
| Line | Meaning |
|---|---|
| `CANDIDATE: () gated by main-backstop | train ` |
NOTHING_NEW: origin/main <sha> is already released as v<X> |
nothing merged since the last release; exit 0 |
NO_GREEN_COMMIT: ... with SKIPPED: lines |
nothing in the window passed the gate; exit 1 (a dry run exits 0: the skips are its answer) |
REFUSED: non-fast-forward: ... |
the candidate is behind stable; stable only moves forward |
REFUSED: queue frozen since train ... |
the main backstop froze the queue; clear it first (docs/ship-policy.md) |
REFUSED: tag v<X> already names <other sha> |
a version was stamped twice; needs a look before anything is cut |
REFUSED_FLOOR: stable moved to v<X> at <time>, <h> h ago; ... |
inside the 72-hour floor; nothing changed. Exit 1 by hand, 0 on the schedule or a dry run |
NEXT_ALLOWED: <time> for a hand-run cut; <time> for a scheduled run |
follows every REFUSED_FLOOR (and FLOOR_UNKNOWN, where it says why there is no time) |
FLOOR_UNKNOWN: ... |
stable's last move cannot be dated (no annotated v<VERSION> tag, an unreadable release, or an unpublished release under a ref cut); exit 1 on every trigger |
REFUSED_SECURITY: ... |
security without ref, a reason the tool cannot tie to the released commits, or a security tag that never moved stable run without security; exit 1 on every trigger |
| `FLOOR: clear | refused |
SECURITY: `<reason>` (verified: <evidence>), RIDING_ALONG: <n> other versions ship with the fix |
a security cut's plan |
TAG:, STABLE:, RELEASE: |
what the cut did; a re-run reports each step as already done and finishes a step an earlier run did not reach |