Plan File Discovery now prefers an explicit binding (the plan-mode file
or /autoplan ACTIVE_PLAN from the conversation, then a "Plan: <path>"
line in the PR body), then lists candidates: repo-committed
docs/designs/ files this branch changed or that name it, and personal
plan files that name the branch. Candidates are offered, never picked
silently. The repo-name match and the newest-file-of-the-day fallback,
which audited PRs against unrelated plans, are gone. With nothing bound
or chosen it prints the exact line 'Plan completion audit: not run (...).
Fix: add "Plan: <path>" to the PR body, or run /autoplan.'
/ship's parent now binds the plan before dispatching the audit
subagent ({{PLAN_COMPLETION_GATE_SHIP:discovery}}), so the child never
searches. Migrates three tests that pinned the old markers and notice.
Co-authored-by: loulanyue <260355617@qq.com>
63 lines
3.2 KiB
Cheetah
63 lines
3.2 KiB
Cheetah
## Step 8: Plan Completion Audit
|
|
|
|
Complete this section in order:
|
|
1. Dispatch the audit, validate its result and resolve its Gate Logic.
|
|
2. Collect the plan's executable checks in Step 8.1; do not run them yet.
|
|
3. Run Step 8.2 Scope Drift.
|
|
4. Run Prior Learnings, including its setting question when offered, then proceed to Step 9 for review and QA.
|
|
|
|
**Dispatch this step as a subagent** using Agent, `subagent_type: "general-purpose"`
|
|
and `run_in_background: false`. Use Step 7's shared foreground-dispatch rule.
|
|
The child reads the plan and every referenced
|
|
code file; the parent validates its report and applies the gates below.
|
|
|
|
**Before dispatch, the parent binds the plan:**
|
|
|
|
{{PLAN_COMPLETION_GATE_SHIP:discovery}}
|
|
|
|
**Subagent prompt:** Substitute `<base>` and supply the bound plan's absolute path
|
|
or complete text, including user-approved scope changes. When discovery printed the
|
|
not-run line, skip dispatch. The child does not inherit the parent's conversation.
|
|
|
|
````text
|
|
You are running a ship-workflow plan completion audit. The base branch is `<base>`. Use `git diff origin/<base>` and inspect untracked files from `git status` to see the full proposed change. Do not commit or push. Report only: classify every item, but do not execute Gate Logic, ask the user, or advance the workflow. The parent applies those gates to your report.
|
|
|
|
{{PLAN_COMPLETION_AUDIT_SHIP}}
|
|
|
|
After your analysis, output a single JSON object with exactly these seven fields on the LAST LINE of your response (no other text after it):
|
|
{"total_items":N,"done":N,"changed":N,"partial":N,"not_done":N,"unverifiable":N,"summary":"<markdown checklist for PR body>"}
|
|
Counts map one-to-one to the classifications above and sum to total_items. No plan or no actionable items means all counts are zero with the skip reason in summary. Do not classify work as deferred; only the parent can record a user-approved deferral.
|
|
````
|
|
|
|
**Parent processing:**
|
|
|
|
1. Check the task's terminal status. Without successful completion and valid LAST-line
|
|
JSON, use the audit-failure fallback below. Require exactly the seven declared
|
|
fields: nonnegative integer counts whose classification sum equals `total_items`,
|
|
and a string `summary`. Missing,
|
|
extra or invalid fields fail. Valid no-plan/no-actionable reports retain zero counts
|
|
and their summary.
|
|
2. Store counts for Step 20 and `summary` for Step 19's `## Plan Completion`.
|
|
3. Apply Gate Logic below before continuing. Carry approved deferrals, with item text
|
|
and plan path, to Step 14; keep them separate from dropped scope. The gate supplies
|
|
the required PR notes and per-item manual verification evidence.
|
|
|
|
**Audit-failure fallback:** On failure, invalid JSON or no final output after ~10
|
|
minutes, stop any live child and confirm it stopped before an inline audit with the same
|
|
extraction/classification logic; never race a late result. If that also fails,
|
|
AskUserQuestion: A) Skip audit and ship, recording the reason in the PR body and
|
|
Step 20 metrics; B) Stop and fix the audit (recommended/default). Never fail open
|
|
silently: a skipped audit would let unverified plan items ship as done.
|
|
|
|
---
|
|
|
|
{{PLAN_COMPLETION_GATE_SHIP}}
|
|
|
|
{{PLAN_VERIFICATION_EXEC}}
|
|
|
|
{{SCOPE_DRIFT}}
|
|
|
|
{{LEARNINGS_SEARCH:query=release ship version changelog merge pr}}
|
|
|
|
---
|